top of page

Standard Engine Evolution #1

Objective: 

Develop a supply; deploy and advance 200' 1 3/4" crosslay.

​

Procedure:

1. Spot engine at hydrant

2. 200' wet forward lay

3. Attack company in SCBA, not on air

4. Advance dry 200' 1 3/4" pre-connect to 100'

5. Charge line

6. After stream is flowing with correct pressure, advance line 50' nozzle open



Standard Engine Evolution #2

Objective: 

Develop a supply and deploy a metro pack 200' from the engine.

​

Procedure:

1. Engine spots hydrant

2. 200' of 2 1/2" hose advance

3. Supply established by Engineer/Operator

3. Attach "Metro Pack" (1 3/4" hose pack)

4. Attack company in SCBA - on air

5. After stream is established, line is advanced 50', flowing



Standard Engine Evolution #3

Objective: 

Develop a supply and deploy 150' 2 1/2" hose.

​

Procedure:

1. Spot engine at hydrant

2. 150' of 2 1/2" hose advanced

3. Supply established by Engineer

4. Attack company in SCBA-on air

5. After stream is established, shut line down, advance 25', then re-establish stream



Standard Truck Evolution #2

Objective: 

Utilize aerial ladder and vertical vent commercial structure.

​

Procedure:

1. Truck spots at structure

2. Crew in SCBA, not on air

3. Aerial and second egress deployed

4. Proper equipment brought to the rood

bottom of page